Fit Out

Overstock

Description The Design and Build fitout of offices to 2 number floors in Westgate Building, Finisklin. This included creation of offices, meeting rooms and general workspaces, as well as bespoke canteens and kitchens. Key Packages Mechanical Eletrical Ceilings and Partitions Flooring Fitted Furniture Key Deliverables 12 week fitout programme

Overstock Read More »

AIB Refresh Projects

Description Complete refurbishment of existing branches. All branches remained operational during the construction. Works were carried out on a phased basis with evening and weekend work. Strip out of all finishes and installation of new partitions, ceilings, joinery, glazed partitions, painting and specialist joinery. Mechanical and electrical services including integration with existing live services. Key

AIB Refresh Projects Read More »

Office Fit-Out for Abbott Laboratories

Description Office re-configuration and fit-out over 2 floors (circa 2200m2) consisting of demolitions, new stud partitions, re-organisation of services, new floor and ceiling finishes, new folding partition and new glazed partitions together with full re-decoration throughout. Key Packages Folding Partitions Glazed Partitions Mechanical Installations Electrical Installations Suspended Ceilings Key Deliverables Key Areas to Remain operational

Office Fit-Out for Abbott Laboratories Read More »

Embankment House

Description The project consisted of the refurbishment of an existing 5 storey split level office building (circa 3000m2) beginning with strip out works. Refurbishment works internally included the provision of a complete new electrical and mechanical fit out incl air conditioning, construction of 2Nr. new liftshafts incl. piling works for same, new internal partitions and

Embankment House Read More »

Sligo General Hospital

Description Refurbishment of existing public wards, nurses station, offices and toilet facilities, including mechanical and electrical installations integrating with live services. Facilitating and controlling the safe removal of asbestos ceilings. Controlling and monitoring dust to prevent infection and contamination Key Packages Mechanical & electrical installation. Specialist joinery. Partitions and ceilings. Floor finishes. Internal finishes. Key

Sligo General Hospital Read More »

INTREO Offices

Description Refurbishment of existing offices, complete refurbishment of reception areas, welfare facilities, public liaison areas, and office areas. The works were in multi user office block, co-ordination with all the stakeholders and the general public was a key consideration. Safe access and egress was maintained at all times. Noise and dust were monitored at all

INTREO Offices Read More »

Kingsbridge Castlebar

Description Fit out of office building to provide office and learning spaces for the VEC. Floor, wall and ceiling finishes including mechanical & electrical installation. Areas include computer lab, tutorials rooms, office and reception areas. The building is located on a busy junction, early morning deliveries ensured no interference to general trading. Key Packages Mechanical

Kingsbridge Castlebar Read More »