Description

Construction of a 500m, 1300mm diameter concrete pipeline, to depths of 7m in rock, to alleviate flood water from Sprackburn Tributary. Including 10nr precast manholes, 34m of interceptor channel, trashscreens, headwalls and monitoring station.

Key Packages

  • Groundworks and trench excavation.
  • Precast structures- manholes, headwalls and trashscreens.
  • M&E for flood monitoring.
  • Extensive rock breaking

Key Deliverables

  • Work carried out within the confines of the existing acute hospital campus.
  • Environmental controls, dust control to reduce risk of Aspergillus infection.
  • Noise and security monitoring due to adjacency to mental health facility.
Location:
Letterkenny General Hospital, Letterkenny Co.Donegal
Value:
€0.8m
Client:
HSE Estates
Design Team Architect:
Tobin Consulting Engineers