Description

Construction of 2nr 2200m3 precast bulk water storage tanks, stainless steel process pipework, control building. Mechanical and electrical installation and extensive site works. Works were carried out in a live environment with no disruption to production.

Key Packages

  • Bulk excavations (30,000m3) in rock.
  • Pre-cast concrete storage tanks.
  • Stainless steel process pipework.
  • Ductile iron pipework.
  • Control building with ‘Forticrete’ facade.

Key Deliverables

  • Working in a live production environment.
  • Completing a tie in of services on a pre-scheduled shutdown.
  • Integrated traffic management plan within operating facility.
  • Dust suppression measures.
Location:
Ballina, Co. Mayo
Value:
€1.6m
Client:
Ballina Beverages (Coca Cola)
Design Team Architect:
Tobin Consulting Engineers